The Mavericks started to mount their new clamping system, mounted pistons to their lifting mechanism, and worked on pneumatics. A few of their members also worked on Clockwork’s shooter with some of their spare time.

Mentor

The mentors attached their sled to their arm.

Panthers

The Panthers repaired their elevator, worked with some broken chain, worked on pneumatics, and began mounting different elements of their mechanism to their robot.

3rd Pick

3rd Pick came up with another new idea for their mechanism design due to a lack of time. They began a snow plow design which was worked on by the majority of the team. Their programmers read over Java tutorials.